Tuesday, September 15, 2009

plumbing and framing continues

september 9 progress:

l to r: shower, sink, toilet
framing between laundry and hall bath
at the end of the day, they mostly finished the framing between the master bedroom and bath.
l to r: 2nd closet alcove, pocket door into bath
the closet is our 2nd closet in the master bedroom because the 1st closet is existing and small. we decided to make a closet alcove instead of a full closet to maximize the space inside it. it's not a full depth closet anyway so we plan to install cubbies and a curtain. we changed the door into the bath from a swinging to a pocket door to give us more space in both rooms.